TM 11-6625-648-12
CHAPTER 5
SHIPMENT AND LIMITED STORAGE
b. Packaging. Package the items of the AN/PTM-7
5-1. Repackaging Procedure
The exact procedure for repackaging depends on the
as outlined below:
material available and the conditions under which the
(1) If available, use the original packing case; if
equipment is to be shipped or stored. Adapt the
cumstances permit. The information concerning the
original packaging (para 2-1) will also be helpful.
(2) Make sure all BA-30's have been removed
5-2. Material Requirements and Packag-
from the battery compartment.
ing
(3) Wrap accessories in batting material and place
a. Material Requirements. The following materials
them in the accessory box. Pack any vacant spaces with
are required for packaging Test Set, Telephone
AN/PTM-7. For stock numbers of materials, refer to
batting. Close the compartment door and shut the case
SB 38-100.
cover.
Material
Quantity
Plyboard (6 ply) . . . . . . . . . . . . . . . . . . . . . . . . . .
4ft. x 4 ft.
AN/PTM-7 in the packing case in the order shown in
28 ft.
Furring ( in. x 2 in.) . . . . . . . . . . . . . . . . . . . .
Nails, common (2 in.) . . . . . . . . . . . . . . . . . . . . .
2 lb.
(5) Nail the lid on the packing case.
Fiberboard, corrugated . . . . . . . . . . . . . . . . . . . . .
36 sq. ft.
Batting material . . . . . . . . . . . . . . . . . . . . . . .
6 sq. ft.
Change 4
5-1