TM 11-5815-602-10
EE161-DM-OPl-010/E154UGC74
TO 31W4-2UGC74-1
Same procedures as RO and KSR state, except that the system is powered down.
(1)
The STATE switch is placed in the ICT state and powered up.
(2)
Operation Validation/State Determination message shows switch positions.
(3)
(4)
Example: Typical ICT Operation Validation/State Determination Printout.
SYSTEM INITIALIZED
SWITCH STATE - ICT
OPERATIONAL STATE - ICT
OPERATING CAPACITY - FULL
MODE - ASCII
BAUD RATE -
STOP BITS -2
END OF LINE OPTION -
SPACE OPTION - OFF
LINE LENGTH -
LINE FEEDS -1
RECEIVE ENVELOPE OPTION = 56 5A 43 5A 43: 4E 4E 4E 4E 7F 7F 7F 7F 7F 7F 7F
7F 7F 7F 7F 7F
TRANSMIT ENVELOPE OPTION = 56 5A 43 5A 43: 4E 4E 4E 4E 7F 7F 7F 7F 7F 7F
7F 7F 7F 7F 7F
PARITY OPTION = ODD
CAPITAL LETTER OPTION = ON
2-57