TM 11-6625-596-12
CHAPTER 5
SHIPMENT, LIMITED STORAGE, AND
DEMOLITION TO PREVENT ENEMY USE
Section I. SHIPMENT AND LIMITED STORAGE
procedures outlined below whenever circumstances
5-1.
Disassembly of Equipment
permit.
The information concerning the original
packaging (para 2-i and fig. 2-1) will also be helpful.
To prepare Telephone Test Set TS-716/U for shipment
and storage, proceed as follows:
a. Material Requirements.
The following
materials are required for packaging the TS-716/U. For
a. Place the coupler in the position shown in
stock numbers of materials, refer to SB 38-100.
Material
Quantity
b. Place the cover on the spare parts
compartment, locking the two quick-disconnect
Tape, cloth-backed, waterproof ................
15 ft.
fasteners.
Adhesive, water-resistant..........................
1/4 pint
Fiberboard, corrugated .............................
30 sq. ft.
c. Secure the power plug in the receptacle in
Corrugated carton .....................................
1
the side of the spare parts compartment.
b. Packaging. Form pads of corrugated
d. Close the dual chassis assembly (1A3 and
material on the top, bottom, two ends, and two sides, as
1A4, fig. 1-1), lock the three quick-disconnect latches,
insert the dual chassis in bottom case assembly 1A1
on the corrugated carton. Place the bottom pad in the
carton and set the TS-716/U on it. Place the side pads
and then the top pad in the carton. Cement together the
e. Place top case assembly 1A2 on bottom
top flaps of the carton. Seal all carton seams, end
case assembly 1A1 and lock the latches.
edges, and the manufacturer's joint with waterproof
tape.
5-2.
Repacking for Shipment or Limited Storage
c. Packing. Pack each packaged TS-716/U in
The exact procedure for repacking depends on the
a nailed wooden box.
material available and the conditions under which the
TS-716/U is to be shipped or stored.
Adapt the
5-1